Safe drinking water comes straight from the faucet.
We extract surface water instead of drilling deep wells for groundwater. Too much drilling damages the integrity of the land and causes sinkholes.
The WTP facility consists of two generators to ensure 24/7/365 operations and water production/supply. Our team of engineers and chemists work constantly to ensure the quality of water supply.
Our brand new reservoir tank in Barangay Libertad, Baclayon, is the biggest in Bohol. It has a capacity of 2,000 cubic meters.
Dear Valued Consumers, Please be informed that Richli Water Inc. will conduct preventive maintenance on Rapid Sand Filter No. 1 (RSF 1) starting October 1, 2026. As part of this important maintenance activity, the existing filter media of RSF 1 will be replaced with new imported filter media from Vietnam, which has already arrived and is ready for installation. 🛠️ Expected Maintenance Duration: Approximately 3–4 days (conservative estimate) 💧 Expected Pipeline Pressure Recovery Period: Approximately 10–12 days Please note that while the physical maintenance and filter media replacement are expected to take around 3–4 days, the water system will require additional time to gradually recover and stabilize after the maintenance. During the recovery period, consumers may experience low water pressure, intermittent supply, or reduced water availability, particularly in elevated and far-end areas. We encourage all consumers to store sufficient water for essential household needs before October 1, 2026, especially those in areas that are more susceptible to low pressure during system recovery. We sincerely apologize for any inconvenience this may cause and appreciate your continued understanding as we work to improve our water service. Thank you for your patience and continued trust in Richli Water Inc.
Posted on: Wednesday 23rd of September 2026
By: Richli Water Inc.
OUR SERVICES: ● 16 Cubic Water Capacity ● Fresh, Clean, and Potable Water ● Convenient Delivery to Your Doorstep ● Prompt and Professional Service
Posted on: Wednesday 24th of June 2026
By: Richli Water Inc.
To our valued consumers, Please be informed that the Admin Team will be conducting an emergency leak repair on our 6-inch distribution pipeline located at P7 Rosario, Cortes, Bohol (Bridge going to Patrocinio). The subject area will experience from low to no water supply during the interruption schedule. The subject area will experience low to no water supply during the interruption schedule. Date: June 13, 2026 Time: 2:00 PM until 08:00 PM Affected Area: Rosario, Loreto, San Roque, Malayo Norte & Gallares Hospital Scope of Work: Leak Repair of Damaged 6-inch HDPE Pipeline Nature of Work: Emergency Repair ACTIVITY: Leak Repair of Damaged 6-inch HDPE Pipeline Emergency Leak Repair We sincerely apologize for the inconvenience this will cause you. We request your patience and understanding on this matter.
Posted on: Saturday 13th of June 2026
By: Richli Water Inc.
"More Water, More Life"